2006 Price list
Effective
Vessels not pre-paid, add
$15.00 per day, vessels not under contract, add $75.00 per day
DRY
STORAGE ON WAYS in work yard, pre-paid
with 5 day minimum . . . . . . . . . . . . . . . . . . . . $40.00/day
Plus hook-up fees, metered charges for utilities, and other services as they
apply.
Monthly discounts may be applied when pre-paid – pay for first 20 days of a
full calendar month only
(other conditions may apply)
Parking
for boat trailer or small boat on trailer (up to 19 ft, 3 month minimum
pre-paid) . . . . . . $80.00/month
Parking
for boat trailer or small boat on trailer (20 to 29 ft, 3 month minimum
pre-paid) . . . . . . $200.00/month
Re-launch
for vessels on ways must be scheduled in writing at least 14 days prior, full
daily charges apply until launch, even if launch is delayed by yard schedule or
equipment failure. PAYMENT FOR LAUNCH
LIFT
LAUNCH
Additional fees may apply for special conditions or for vessels over 40 ft long
or 10 ft wide or for
additional slings, additional
labor, etc.
Layover
on rail ways, pre-paid, first 3 days . . . . . . . . . . . . . . . . . . . . .
. . . . . . . $ 45.00
Layover
on rail ways, pre-paid, day 4 through day 30
. . . . . . . . . . . . . . . . . . . . . . . . $ 65.00/day
Layover
on rail ways, pre-paid, day 31 to 90 . .
. . . . . . . . . . . . . . . . . . . . . . . . . . $100.00/day
Layover
on ways, (railway or travel lift), pre-paid, day 91 to 180 . . . . . . . . . . . . . . . . . $225.00/day
Reposition
to work yard or to lift, each move, $75.00/HR. . . . . . . . . . . . . . . . .
. . . . . . $100.00 minimum
FILTER
CLOTH, each change (required when dirty or saturated) . . . . . . . . . . . .
$3.00/ft plus labor time and lift
SERVICES
Repaint
bottom, includes up to one hour pressure washing and prep. . . . . . . . . . .
. . . . . . . .$ 15.00/ft plus material
(up to 8ft wide, then add 1$ per lin. Ft, for each 1 foot of beam, includes 2
coats)
Epoxy
Barrier coat, includes one hour prep and no fairing or filling. . . . . . . . .
. . . . . . . . $50.00/ ft plus material
Any additional cleaning, sandblasting, fairing, filling, etc. . . . . . . . . .
. . . . . . . . $75.00/hour plus material
Labor
rate (minimum 1 hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . $75.00/hour
Outside
labor surcharge* (approved contractors) . . . . . . . . . . . . . . . . . . per
job fee, plus $ 45.00/person/day
Tractor,
travel lift, or boom truck, in yard (one hour minimum) . . . . . . . . . . . .
. . . . . . . $ 75.00 per hour
Hydraulic
Trailer in yard, $100.00 hook-up fee, in yard, (includes first one-half hour) .
. . . . . . $100.00/hr
OUTSIDE SERVICES
Outside
contractors providing services for your vessel while in our workyard will be
charged a surcharge based on a percentage of the job, and/or a minimum rate of
$ 40.00 per person per day.
RIGGING EQUIPMENT in yard
day
1 to day 30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . .no charge
day
31 to day 365, and each 365 days (or part thereof) after:
Blocking . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . $ 2.00 each
Jack Stands . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .$ 35.00 each
Sail Boat Stands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . $ 75.00 each
OTHER
EQUIPMENT
pressure
washer (2 hr. minimum) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . $75.00/hour
electric
pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . $ 10.00 initial fee, plus $6.00/day
3
inch mud pump, or centrifugal pump, each (used or not) . . . . . . . . . . . .
. . . . . . . . . . .$125.00 initial fee, plus $30.00 /day
TRASH
REMOVAL
$100.00
minimum fee, plus $10.00 per item or $1.00 per pound which ever is greater,
plus $2.00/round trip mile, plus posted labor rate, plus applicable dump fees
at cost +30%.
Hazardous or Class III trash subject to a minimum
$175.00 documentation fee, plus placard fees and special assessments.
Storage charges will apply. All Hazardous or Class III removed by outside
contractors, cost +30%+ $300.00
TRASH
REMOVAL pre arranged
small
dump trailer, non-hazardous, . . . . . . . . . . . . . . . . . . . . . dump
fees plus 15%, plus $75.00 per load
approved
petroleum in sealed 5 gallon containers, . . . . . . . . . . . . . . . . . . .
$25.00 each plus disposal fee
Batteries,
each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . .$10 .00
Paint
cans, brushes, rollers, dry, each . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . .$2 .00
Cleaning
up after dog or pet $20.00 – Cigarette butts $2.00 each, 20.00 minimum each
time
All
clean up and disposal costs for paint chips, paint drips, grinding and sanding
dust, and the like will be charged at cost + 25%, plus transportation, + $75.00
per hour for clean up.
Work
yard Materials not supplied by Jean Street Shipyard, Inc. will be
charged an assessment fee when brought into the yard
Rates
in this publication are estimates actual charges may vary from vessel to vessel
and rates are subject to change without notice
Unless
otherwise noted,